Zone 1 - Route 176 Corridor

 

I-26 from near Jedburg Road to near Nexton Parkway

Jedurg Road Interchange Improvements and widening of I-26 from mile marker 193 to mile marker 197. This project consists of improving the interchange of Jedburg Road at I-26 and widening Jedburg Road from two lanes to five lanes from Drop-off Drive to Old Dairy Road.

Learn More →


I-26 from Exit 187 to Exit 194

Widening of I-26 from approximately mile marker 187 to mile marker 193, including an interchange improvement at SC Hwy. 27 and two twin bridge replacements over Cypress Swamp.

Learn More →


Back Tom Road (Phase 2)

Project consists of major resurfacing from Black Tom extension to US 17A, approximately 1.8 miles

Learn More →


US 176 (Phase 1)

Phase 1 of this project consists of widening US 176 from two lanes to five lanes from US 17 Alt. to Jedburg Road/Cooper Store Road, a distance of approximately 7 miles.

Learn More →


US 176 (Phase 2)

Phase 2 of the widening of US 176 consists of widening US 176 from two lanes to five lanes from Jedburg Road/Cooper Store Road to Center Line Road, a distance of approximately 4 miles.

Learn More →


US 176 (Phase 3)

Phase 3 of the widening of US 176 will consist of widening US 176 from two lanes to four lanes with raised concrete median from Jedburg//Cooper Store Road to Volvo Car Drive, a distance of approximately 4 miles.

Learn More →


Jedburg Road

This project consists of resurfacing Jedburg Road.

Learn More


Ridgeville Interchange

This interchange is a part of I-26 from Exit 187 to Exit 193 improvements. The construction is to provide resurfacing, striping and implement controlled access through turn lanes and signage with a rerouting of a frontage road.

Learn More →


SC Hwy. 27 from I-26 to Autonomous Drive

The construction effort will entail resurfacing, and widening the road to three lanes, as well as anew traffic light at the intersection of Autonomous and SC Highway 27.

Learn More →


Nexton Parkway I-26 Interchange & I-26 Widening

This project consists of constructing a new interchange on I-26 just west of the existing Sheep Island Road overpass.

Learn More →


Nexton Parkway at Cane Bay

This project consists of constructing a new location section of Nexton Parkway from US 176 approximately 2000-ft. to tie into future construction of Nexton Parkway.

Learn More →


Volvo Interchange

SCDOT is constructing a new three-leg directional interchange along I-26 in Berkeley County.

Learn More →